DAN Project
Turnkey Delivery in 12 Days: Smart Structures for DAN – Al Ihsa, KSA
In just 12 days, ALBADDAD transformed a vision into a fully operational, premium-grade modular facility in Al Ihsa, Kingdom of Saudi Arabia. Designed and built for our client DAN, this Smart Structure project stands as a benchmark in speed, precision, and turnkey delivery for the region’s modular construction sector.
Client & Location
DAN, a key player in the KSA commercial and industrial sectors, selected ALBADDAD to execute a fast-paced project in Al Ihsa. With minimal lead time and no margin for error, the client required two fully enclosed structures for high-visibility use, with both durability and a refined interior finish.
Scope of Work
The project comprised two custom-designed Smart Structures:
-
Structure 1: 30m x 40m with a side height of 7m
-
Structure 2: 10m x 40m with a side height of 7m
Combined, the structures delivered over 1,600 sqm of built-up modular space, incorporating:
External Walling
-
280 sqm of tempered glass wall panels for natural lighting and aesthetics
-
1,120 sqm of insulated hard panels ensuring enclosure and climate control
Interior Finish
-
3,520 sqm of elegant satin lining fabric, offering a seamless, polished look for the full ceiling and wall surfaces
Access & Openings
-
6 double-hinged and 4 single-hinged doors constructed from insulated aluminum and matching panel cladding
Flooring System
-
1,600 sqm of raised wooden cassette flooring
-
Finished with 3–4mm commercial-grade carpet for durability and comfort
Climate Control
-
9 HVAC units delivering a total of 198 tons of ductless cooling
Electrical Works
-
Complete internal and external fittings, including lighting, power outlets, and distribution
Challenges & Execution
The timeline was tight — just 12 days to complete civil works, structure installation, interior fit-out, and full commissioning. ALBADDAD’s modular engineering team deployed with precision, leveraging our prefabrication expertise and in-house logistics.
Site conditions in Al Ihsa demanded high-temperature resilience, dust control, and rapid assembly. We implemented a direct cooling strategy without ductwork to maximize air circulation while reducing complexity — ideal for fast deployment and reliable operation.
Materials & Engineering Excellence
All materials were selected for performance and durability in harsh Gulf climates:
-
Aluminum and Steel Framing
-
Tempered Glass Panels
-
Insulated Wall Panels
-
Raised Cassette Flooring System
-
Ductless HVAC Technology
-
Satin-Finish Interior Lining
Results
-
Total Area Delivered: 1,600 sqm
-
Completion Time: 12 calendar days
-
Cooling Capacity: 198 tons
-
Scope: Full turnkey – civil works, structure, HVAC, MEP, flooring, finishing
The result? A fully operational modular facility delivered on time, exceeding expectations for quality, design, and performance.
Conclusion
Whether you’re looking to scale fast, build smart, or deploy premium modular environments across the GCC and beyond — ALBADDAD delivers.
For Sales Inquiries
📲 WhatsApp: +971 50 663 4400
📩 Email: info@albaddad.com

